Invest News DetailOil&Gas Journal - A group led by Incremental Petroleum Ltd., Perth, plans to start gas production in mid-2009 from the Edirne license in the Thrace basin in the northwest of Istanbul. Turkish authorities granted the group a wholesale license that allows gas sales to the national grid, and the group awarded contracts for the design and engineering of a gas processing plant and pipeline. Uhde Shedden of Australia won the gas plant contract, and Boral of Türkiye will design and route the pipeline. Uhde designed the plant for Zorlu, formerly Amity, field 70 km from Edirne. The joint venture of Incremental, operator with 55% interest, Otto Energy Ltd., Perth, 35%, and Petrako Energy 10%, has made six new field gas discoveries on the license since 2004.